Silence is not luck. It is a process with five steps and one number at the end.
Method
01 · Five steps68 → 25 dB
From a plot to the first quiet night.
-
01
Silence audit
We place sound meters on the plot and record day and night, weekdays and weekends. You get a sound map and an honest answer: build here or keep looking.
7 days
68 → 55 dB
-
02
Concept
We turn the house away from noise and towards light: volume, courtyard, where each room sits. You see the idea in drawings and models.
6 weeks
55 → 44 dB
-
03
Design & acoustics
Architect and acoustic engineer work side by side. Every wall, window and duct is checked against the target number.
4 months
44 → 33 dB
-
04
Construction
We are on site every week. Acoustic tests at three points of the build, not once at the end.
12–18 months
33 → 27 dB
-
05
The first night
We measure the bedroom with you after you move in. The number goes into your house file.
1 night
27 → 25 dB
02 · The promise25 dB
25 dB in every bedroom. Written in the contract.
If the number is higher
We fix it at our cost. The measurement is done together with you, on the first night, in the bedroom.
03 · Starting point2026
What it costs to begin.
Silence auditFrom €1,200 · credited to the project
Architecture & acousticsFrom €180 per m²
Construction supervisionBy agreement

Next · Silence audit7 days
Book an audit →From €1,200